Launching Fall 2026. We're completing Washington contractor registration — nothing is for sale here yet. Join the waitlist for first-slot priority.
Salish Water WorksPuget Sound · Water Treatment

Planned launch pricing · not yet bookable

Three systems.
Prices published before we meet you.

This is the pricing we plan to launch with in Fall 2026, shown now so you can judge us against the in-home-demo quotes. Every price is + WA sales tax (Washington taxes the full installed price; it will always be a separate line on any future invoice). Nothing on this page can be purchased or booked today.

Every install includes leak protection: a leak-sensor kit on Tier 1, and leak sensors with automatic water shutoff on Tiers 2–3. Well installs (Tier 3) also include a post-install retest by a Washington-accredited lab — you see the after numbers, not just our word.
Tier 1 · City water · drinking tap

Tap Pure — under-sink reverse osmosis

from $1,190+ WA sales tax
planned launch price

A six-stage under-sink reverse osmosis system with remineralization, professionally installed at your kitchen tap in about two hours. The system is NSF/ANSI 58 certified (dissolved solids, lead, fluoride, and more), and reverse osmosis membranes reduce PFAS — per manufacturer test data. If PFAS at the tap is your concern, this is the tier that addresses it.

Tier 2 · City water · whole home

Whole-House Carbon

from $3,190+ WA sales tax
planned launch price

A backwashing catalytic-carbon tank on your main line, treating every tap, shower, and appliance for chlorine, chloramine, taste, odor, and organic compounds. Built on the industry-standard Fleck 5600SXT valve — parts and media are commodity items from dozens of vendors, so you're never locked to us for service.

Honest scope: whole-house carbon is a taste, odor, and chlorine/chloramine system. For PFAS in drinking water, the treatment we plan to offer is the under-sink RO at the tap — add it to this tier for +$650.

Tier 3 · Well water

Well Stack — sized from your water test

from $5,950 base+ modules · + WA sales tax
planned launch price

Private wells don't get state testing — so this tier starts with a lab-grade water test, and the system is built from what the test says, module by module, at published prices. No blind bundles, no "whole-package" number invented at your kitchen table.

ComponentWhat it doesPlanned price
Base stackSediment prefilter + backwashing catalytic carbon + 48k water softener + under-sink RO, leak sensors with auto-shutoff, and a post-install retest by a WA-accredited lab$5,950 + tax
Iron moduleAir-injection iron / sulfur / manganese filter — added only when your water test shows it's needed+$2,050 + tax
UV moduleUV disinfection for bacteria, sized to NSF/EPA dosing at household flow — added when the test shows coliform risk+$1,750 + tax

A typical iron-well job (base + iron module) lands around $7,800 + tax; the full stack with both modules around $9,550 + tax. Comparable dealer-installed well systems in this region are routinely quoted at $10,000–$15,000 after the in-home demo. Your final quote comes from your water test — and you'll see it as line items at these prices, not a lump sum.

What "transparent pricing" means here

The dominant model in water treatment is a free in-home "water test" that's actually a sales demonstration, followed by a quote calibrated to your reaction — which is how a carbon tank and a softener become a $12,000 decision. We publish planned prices first, diagnose from public state data and accredited lab tests, and pay no commissions. If we can't beat the demo-model quote with a published price, we don't deserve the job.

Not yet bookable: Salish Water Works is completing Washington contractor registration (RCW 18.27) and does not currently offer, bid on, or perform installation work. The prices above are planned launch pricing shown for context only. Joining the waitlist is free, takes no payment, and creates no obligation.

Free · no payment · no obligation

Reserve a launch slot at these prices

We plan to open installation scheduling in Fall 2026, once our Washington contractor registration is complete. Waitlist members get first pick of launch slots and launch pricing. Reserving costs nothing and commits you to nothing.

No payment, no deposit, no obligation. One launch email when scheduling opens — that's it.